
CRL 9BL Series Mill 118-1/8" Square Base Shoe Drilled for 13/16" Glass
Buy More, Save More!
| Product quantity | Discount |
|---|---|
| Buy 3 | 2% off |
| Buy 5 | 4% off |
| Buy 10 | 6% off |
| Buy 15 | 8% off |
| Buy 20 | 10% off |
Overview
| SKU | 9BL21D |
|---|---|
| Pack Size | 1 |
| Shipping Limitations | Shipping Quote Required |
| Drilling Center To Center | 11-13/16 in. (300 mm) |
| Finish/Color: | Mill |
| Glazing Thickness | 13/16" (20.64 mm) |
| Glazing Type | Laminated |
| Height | 4-3/4 in. (121 mm) |
| Length | 118-1/8 in. (3000 mm) |
| Material | Aluminum |
| Profile | Drilled |
| Width | 3-3/16 in. (81 mm) |
Description
Product Details
- For 13/16" (20.64 mm) Laminated Tempered Glass (10 x 1.52 x 10 mm)
- Designed and Engineered for 2015 IBC Code Changes
- 30% Lighter Than Industry Standard Base Shoe
- Meets and Exceeds 200lb Load With a 4x Safety Factor
- CRL Recommends Consulting with the Glass Fabricator Prior to Wet Setting Laminated Tempered Glass
- CRL Glass Railing Systems Meets NBC Load Requirements When Installed in Accordance to ICC-3842
This CRL 9BL21D Series Square Base Shoe is the same profile as our standard L21S Series, but it is 30% lighter, which means it is more price competitive, environmentally friendly, and will reduce your shipping costs. Designed to work with CRL's patented TAPER-LOC® System, 9BL can be easily cut to the required length using a chop saw with a minimum 10" (254 mm) diameter blade for aluminum cutting.
GLASS SPECIFICATION:
For use with 13/16" (20.64 mm) Laminated Tempered Glass (10 x 1.52 x 10 mm)
Thickness Range: .803" to .903" (20.4 to 22.9 mm) Will work with ASTM 7/8" Monolithic Tempered Glass Will Not Accommodate the Full ASTM Thickness Range for 13/16" Glass
Product Warning:
CRL does not recommend direct powder coating of this base shoe extrusion. Powder coated cladding applied over the base shoe is the recommended method.
All pre-drilled CRL Base Shoes have a +1/8 (3 mm)/-1/16 (1.5 mm) tolerance between each hole drilled in the base. Before drilling installation holes in the concrete or steel substrate it is recommended that the installer place the base shoe into the planned final position, then mark the position of the holes to be drilled into the substrate.
Specifications
Technical Resources
Brochures & Literature
Installation Instructions
PDF
PDF
PDF
PDFQuote Request Forms
Specifications
CAD Drawings - pdf
CAD Drawings - dwg
Engineering & Test Reports
CRL 9BL Series Mill 118-1/8" Square Base Shoe Drilled for...
Related Products











