CRL Meridian Series Wall Mount Bracket in Brushed Stainless Steel

Buy More, Save More!

Product quantity Discount
Buy 3 2% off
Buy 5 4% off
Buy 10 6% off
Buy 15 8% off
Buy 20 10% off

Overview

SKUHR4WBS
Pack Size1
Centerline Width Projection3-1/8 in. (79 mm)
Finish/Color:Brushed Stainless Steel
MaterialStainless Steel

Description

Product Details

  • Ready-to-Install
  • Two Architectural Finishes Available
  • For 1-1/2" to 2" (38 and 50.8 mm) Diameter Hand Rail Tubing

This CRL Wall Mount Hand Rail Bracket is available in two architectural finishes for 1-1/2" to 2" (38 or 50.8 mm) diameter Hand Rail tubing. Brackets are individually packed and come with a hanger bolt for mounting to the wall.

Stainless Steel Advisory:

Although Stainless Steel is resistant to corrosion, it is not rust or stain proof. CRL recommends periodic maintenance to help maintain its factory finish. For more information, view the Stainless Steel Disclaimer found in the Technical References section below.

Specifications