Product Details
- For 1-1/2" (38 mm) Schedule 40 Pipe Rail
- Ready-to-Install
- 304 Stainless Plus 6063 Mill Aluminum
- Custom End Caps are Also Available
CRL End Caps easily slip into our Schedule 40 and Square Pipe Rails for a finished look. Use of our Cat. No. 32629 Metal Contact Cement is required to achieve a secure and permanent bond at all connections.
Stainless Steel Advisory:
Although Stainless Steel is resistant to corrosion, it is not rust or stain proof. CRL recommends periodic maintenance to help maintain its factory finish. For more information, view the Stainless Steel Disclaimer found in the Technical References section below.