- HC-75 AAMA rated for casement and projected windows
- CW-90 AAMA rated for fixed windows
- Thermally broken system for exceptional thermal performance
- Reinforced corners with extruded aluminum corner key on all vents
All window units are built for dry glaze with exterior tape and E.P.D.M. elastomeric wedge on the interior. Vent construction uses tubular members, mitered and reinforced with an extruded aluminum corner key, then hydraulically crimped for consistent strength and durability.
Optional hardware includes: stainless steel 4-bar hinges, 90° cam locking 4-bar handles (egress casements), 5-knuckle butt hinges, roto operator (out-swing casements only), limit device, friction adjuster, lift-handle lock, access-control lock, screens, wicket box, two-point locking handles, and security locks.
Optional extrusions include: head and jamb channels, mulling bars, subsills, corner pieces, nail fin adapters, and extruded sill flashing.
Common window configurations:
Fixed over Fixed over Fixed
Fixed over Fixed over Project-out
Fixed over Fixed over Casement
Fixed over Fixed over Project-in
Fixed over Project-out over Fixed
Fixed over Project-out over Project-out
Fixed over Project-out over Casement
Fixed over Project-out over Project-in
Fixed over Casement over Fixed
Fixed over Casement over Project-out
Fixed over Casement over Casement
Fixed over Casement over Project-in
Fixed over Project-in over Fixed
Fixed over Project-in over Project-out
Fixed over Project-in over Casement
Fixed over Project-in over Project-in
Project-out over Fixed over Fixed
Project-out over Fixed over Project-out
Project-out over Fixed over Casement
Project-out over Fixed over Project-in
Project-out over Project-out over Fixed
Project-out over Project-out over Project-out
Project-out over Project-out over Casement
Project-out over Project-out over Project-in
Project-out over Casement over Fixed
Project-out over Casement over Project-out
Project-out over Casement over Casement
Project-out over Casement over Project-in
Project-out over Project-in over Fixed
Project-out over Project-in over Project-out
Project-out over Project-in over Casement
Project-out over Project-in over Project-in
Casement over Fixed over Fixed
Casement over Fixed over Project-out
Casement over Fixed over Casement
Casement over Fixed over Project-in
Casement over Project-out over Fixed
Casement over Project-out over Project-out
Casement over Project-out over Casement
Casement over Project-out over Project-in
Casement over Casement over Fixed
Casement